Search This Blog

Showing posts with label Fennema Construction. Show all posts
Showing posts with label Fennema Construction. Show all posts

Sunday, September 20, 2015

Bill Fennema, president of Fennema Construction, has developed the tasks, durations, and predecessor relationships

Problem 3.17 Bill Fennema, president of Fennema Construction, has developed the tasks, durations, and predecessor relationships in the following table for building new motels. Draw the AON network and answer the questions that follow.

Activity Immediate Predecessor Optimistic Most Likely Pessimistic
A - 4 8 10
B A 2 8 24
C A 8 12 16
D A 4 6 10
E B 1 2 3
F E,C 6 8 20
G E,C 2 3 4
H F 2 2 2
I F 6 6 6
J D,G,H 4 6 12
K I,J 2 2 3

a) What is the expected (estimated) time for activity C?
c) Based on the calculation of estimated times, what is the critical path?
d) What is the estimated time of the critical path?


Click here for the solution: Bill Fennema, president of Fennema Construction, has developed the tasks, durations, and predecessor relationships