1) Lasso Corp. budgeted $250,000 of overhead cost for 2008. Actual overhead costs for the year were $240,000. Lasso's plant-wide allocation base, machine hours, was budgeted at 50,000 hours. Actual machine hours were 40,000. Budgeted units to be produced are 100,000 units. Lasso's single plant-wide factory overhead rate for 2008 is
2) Stewart Marketing Inc. manufactures two products, A and B. Presently, the company uses a single Plant-Wide factory overhead rate for allocating overhead to products. From the following information, determine the single-wide factory overhead rate:
Direct Labor
Overhead Hours (dlh) A B
Painting Dept. $248,000 10,000 dlh 16 dlh 4 dlh
Finishing Dept. 72,000 10,000 dlh 4 dlh 16 dlh
Totals $320,000 20,000 dlh 20 dlh 20 dlh
3) The Kaumajet Factory produces two products - small lamps and desk lamps. It has two separate departments - finishing and production. The overhead budget for the finishing department is $550,000, using 500,000 direct labor hours. The overhead budget for the production department is $400,000 using 80,000 direct labor hours. If the budget estimates that a small lamp will require 2 hours of finishing and 1 hours of production, how much factory overhead will be allocated to each unit of small lamps using the multiple production department factory overhead rate method with an allocation base of direct labor hours?
4) Stewart Marketing Inc. manufactures two products, A and B. From the following information, determine the overhead from both production departments allocated to each unit of product A if the company uses a multiple department rate system.
Product
Direct Labor
Overhead Hours (dlh) A B
Painting Dept. $248,000 10,000 dlh 16 dlh 4 dlh
Finishing Dept. 72,000 10,000 dlh 4 dlh 16 dlh
Totals $320,000 20,000 dlh 20 dlh 20 dlh
5) It would make sense to use any of the following as an allocation base for calculating factory overhead rates except:
6) Phelan Systems Corporation is estimating activity costs associated with producting disk drives tapes drives, and wire drives. The indirect labor can be traced for four separate activity pools. The budgeted activity cost and activity base information, along with the estimated activity-based information, is provided below.
Procurement $36000 Number of purchased order
Scheduling $240000 Number of production orders
Material handling $48000 Number of moves
Product development $72000 Number of engineering changes
Production $1420000 Machine hours
Disk Drives 4000(# XXXXX purchase orders) 300(# XXXXX production orders) 1400(# XXXXX moves) 10(# XXXXX engineering changes) 2000(machine hours) 2000(# XXXXX units)
Tape drives 2000(# XXXXX purchase orders) 150(# XXXXX production orders) 600(# XXXXX moves) 5(# XXXXX engineering changes) 8000(machine hours) 4000(# XXXXX units)
Wire drive 12000(# XXXXX purchase orders) 800(# XXXXX production orders) 4000(# XXXXX moves) 25(# XXXXX engineering changes) 10000(machine hours) 2500(# XXXXX units)
Determine the activity rate for the procurement per purchase order.
7) The Nite Lite Factory has determined that its budgeted factory overhead budget for the year is $6,750,000 and budgeted direct labor hours are 5,000,000. Using the single plantwide factory overhead rate based on direct labor hours, determine the factory overhead rate for the year.
8) The southwest leather company manufactures leather handbages (H) and moccasins (M). For Simplicity reasons, they have decided to use single plantwide factory overhead rate method to allocate factory overhead. The factory overhead estimated per unit together with materials and direct labor will help determine selling prices. Calculate the amount of factory overhead to be allocated to each unit using direct labor hours.
Handbags =60,000 units 2 hours of direct labor
Moccasins = 40,000 units, 3 hours of direct labor
Total Budgeted factory overhead cost = 360,000
9) Using multiple department factory overhead rates instead of single plant - wide factory overhead rate:
10) Using a Plant-wide factory overhead rate distorts product costs when:
Click here for the solution: Lasso Corp. budgeted $250,000 of overhead cost for 2008